PDS/ClearSec GD Site Prep/Issue 1 02.01
1
IMPORTANT
•
Any horizontal pipe or conduit runs below the ClearSec must be at least 140mm below FFL.
•
It is the customers responsibility to ensure the structural integrity and strength of the installation location.
•
200mm clear clearance is neededabove the ClearSec for service activities.
Bottom entry conduit location
Fixing locations
Concrete Base to BS 5328:1997
specification. Base to be flat and level to
+/- 5mm over footprint area.
Dimensions to be > 1450 x 2500 x 150
deep min.
Floor Anchors to be drilled during
installation, 12mm dia x 100mm
deep.
Stator bar ‘dead area’ barrier
6.4mm laminated glazing
Stainless steel cladding
Site Preparation ClearSec GD120
(Shown with straight bar rotor)
Product Data Sheet

ปปาณ
……………………………………….……...……………….
………………………………………………………………
PDS/ClearSec GD Site Prep/Issue 1 02.01
2
IMPORTANT
•
Any horizontal pipe or conduit runs below the ClearSec must be at least 140mm below FFL.
•
It is the customers responsibility to ensure the structural integrity and strength of the installation location.
•
200mm clear clearance is neededabove the ClearSec for service activities.
Bottom entry conduit location
Fixing locations
Concrete Base to BS 5328:1997
specification. Base to be flat and level to
+/- 5mm over footprint area.
Dimensions to be > 1450 x 2500 x 150
deep min.
Floor Anchors to be drilled during
installation, 12mm dia x 100mm
deep.
Stator bar ‘dead area’ barrier
6.4mm laminated glazing
Stainless steel cladding
Site Preparation ClearSec GD90
(Shown with straight bar rotor)
Product Sheet

ปปาณ
……………………………………….……...……………….
………………………………………………………………
PDS/ClearSec GD Site Prep/Issue 1 02.01
3
IMPORTANT
•
Any horizontal pipe or conduit runs below the ClearSec must be at least 140mm below FFL.
•
It is the customers responsibility to ensure the structural integrity and strength of the installation location.
•
200mm clear clearance is neededabove the ClearSec for service activities.
Bottom entry conduit location
Fixing locations
Concrete Base to BS 5328:1997
specification. Base to be flat and level to
+/- 5mm over footprint area.
Dimensions to be > 1450 x 2100 x 150
deep min.
Floor Anchors to be drilled during
installation, 12mm dia x 100mm
deep.
Stator bar ‘dead area’ barrier
6.4mm laminated glazing
Stainless steel cladding
Site Preparation ClearSec GD120I
(Shown with straight bar rotor)
Product Sheet

ปปาณ
……………………………………….……...……………….
………………………………………………………………
PDS/ClearSec GD Site Prep/Issue 1 02.01
4
IMPORTANT
•
Any horizontal pipe or conduit runs below the ClearSec must be at least 140mm below FFL.
•
It is the customers responsibility to ensure the structural integrity and strength of the installation location.
•
200mm clear clearance is neededabove the ClearSec for service activities.
Bottom entry conduit location
Fixing locations
Concrete Base to BS 5328:1997
specification. Base to be flat and level to
+/- 5mm over footprint area.
Dimensions to be > 1450 x 2100 x 150
deep min.
Floor Anchors to be drilled during
installation, 12mm dia x 100mm
deep.
Stator bar ‘dead area’ barrier
6.4mm laminated glazing
Stainless steel cladding
Site Preparation ClearSec GD90I
(Shown with straight bar rotor)
Product Sheet